Level 2 — Engineering approximation

Traffic Signal Timing (Webster)

Webster's optimum cycle length, green splits, yellow and all-red intervals, capacity, v/c, delay and queues of a signalised intersection.

How it works — Traffic Signal Timing (Webster)

C 1 2 3

Inputs

1, 2, 3
Critical lane groups

Formula

  • C₀ = (1.5L + 5)/(1 − Y)
  • g_i = (C − L)y_i/Y
  • Y = t + v/(2a + 2Gg)
  • AR = (W + L)/v

Results

C
Cycle used

One phase per line: name, critical flow and saturation flow (veh/h).

Change intervals
Reset

Results

Enter your values and press Calculate. The defaults are a worked example.

Formula

C₀ = (1.5L + 5)/(1 − Y) · g_i = (C − L)y_i/Y · Y = t + v/(2a + 2Gg) · AR = (W + L)/v

Show the math

Worked solution

Press Calculate to see every step with your values substituted.

Calculation level & design standard

Level 2 — Engineering approximation

A preliminary engineering model with the simplifications listed under Assumptions.

Preliminary engineering calculation — no jurisdiction-specific code compliance claimed. Verify the applicable requirements with a qualified professional.

Assumptions

  • Fixed-time, undersaturated operation; Webster's delay formula approximated.
  • Not a Highway Capacity Manual level-of-service analysis.

References

  • F. V. Webster (1958), Traffic signal settings, Road Research Technical Paper 39
  • ITE Traffic Engineering Handbook

Results are for preliminary design and education. Verify against the governing code and have critical work checked by a licensed professional engineer.