Level 1 — Basic calculation
Vertical Curve (Crest & Sag)
K value, BVC/EVC stations and elevations, high or low point and an elevation table of a parabolic vertical curve, with the profile.
How it works — Vertical Curve (Crest & Sag)
Inputs
- g1
- Incoming grade g₁ (%)
- g2
- Outgoing grade g₂ (%)
- L
- Curve length L (m)
Formula
- y = y_BVC + g₁x + (g₂ − g₁)x²/(2L)
- K = L/|A|
- x_turn = −g₁L/(g₂ − g₁)
Results
- K
- Rate of vertical curvature K
Inputs
Results
Enter your values and press Calculate. The defaults are a worked example.
Formula
y = y_BVC + g₁x + (g₂ − g₁)x²/(2L) · K = L/|A| · x_turn = −g₁L/(g₂ − g₁)
Show the math
Worked solution
Press Calculate to see every step with your values substituted.
Calculation level & design standard
Level 1 — Basic calculation
A direct engineering equation.
Preliminary engineering calculation — no jurisdiction-specific code compliance claimed. Verify the applicable requirements with a qualified professional.
Assumptions
- Symmetric parabolic curve; grades in percent.
References
- AASHTO, A Policy on Geometric Design of Highways and Streets (Green Book), 7th ed. 2018
Results are for preliminary design and education. Verify against the governing code and have critical work checked by a licensed professional engineer.
More Civil & Structural tools
- Civil & Structural Stopping Sight Distance & Curve Lengths Stopping sight distance on a grade and the minimum crest and sag vertical curve lengths and horizontal sightline offset needed to provide it. Open tool
- Civil & Structural Horizontal Circular Curve & Stake-Out Tangent, length, external, middle ordinate, long chord and PC/PT stations of a circular road curve, with a deflection-angle stake-out table. Open tool
- Civil & Structural Road Earthwork Volumes & Mass-Haul Diagram Cut and fill volumes between cross-sections by the average end area method, shrinkage and swell, balance and the mass-haul diagram. Open tool
- Civil & Structural Superelevation, Side Friction & Minimum Radius Minimum radius for a design speed, superelevation and side-friction demand on a curve and the superelevation runoff and runout lengths. Open tool