Level 1 — Basic calculation
Tank Detention Time & Loading Rates
Hydraulic detention time, surface overflow rate, horizontal velocity and organic loading of a rectangular treatment tank.
How it works — Tank Detention Time & Loading Rates
Inputs
- Q
- Flow (m³/d)
- L
- Length (m)
- W
- Width (m)
- H
- Water depth (m)
Formula
- t = V/Q
- SOR = Q/A
- L = Q·C
Results
- t
- Hydraulic detention time
Inputs
Results
Enter your values and press Calculate. The defaults are a worked example.
Formula
t = V/Q · SOR = Q/A · L = Q·C
Formulas are evaluated in SI units; inputs and results are converted.
Show the math
Worked solution
Press Calculate to see every step with your values substituted.
Calculation level & design standard
Level 1 — Basic calculation
A direct engineering equation.
Preliminary engineering calculation — no jurisdiction-specific code compliance claimed. Verify the applicable requirements with a qualified professional.
Assumptions
- Plug-flow geometry for the horizontal velocity; average flow.
References
- Metcalf & Eddy, Wastewater Engineering: Treatment and Resource Recovery
Results are for preliminary design and education. Verify against the governing code and have critical work checked by a licensed professional engineer.
More Civil & Structural tools
- Civil & Structural Mixing & Mass Balance (Dilution, Decay) Concentration after two streams mix, mass load, dilution ratio and first-order decay with travel time. Open tool
- Civil & Structural Universal Beam Calculator Reactions, shear force, bending moment and deflection diagrams for simply supported, cantilever, fixed and propped beams with point loads, distributed loads and moments. Open tool
- Civil & Structural Simply Supported Beam (UDL) Bending moment, shear, reactions and mid-span deflection of a simply supported beam under a uniform load. Open tool
- Civil & Structural Concrete Volume Calculator Concrete quantity for slabs and footings with waste allowance, premix bag count and ready-mix truck loads. Open tool