Engineering Economics (NPV, IRR, Payback)

Net present value, internal rate of return, simple and discounted payback, benefit–cost ratio and equivalent annual value for a project.

How it works — Engineering Economics (NPV, IRR, Payback)

I0 CF NPV

Inputs

I0
Initial investment
B
Annual savings or revenue
i
Discount rate (%)
n
Study period (years)

Formula

  • NPV = ΣCF_t/(1 + i)^t
  • ΣCF_t/(1 + IRR)^t = 0

Results

NPV
Net present value
IRR
Internal rate of return
PB
Simple payback

Years 1…n separated by commas, e.g. 2500, 2600, 2700. Replaces the uniform series.

Reset

Results

Enter your values and press Calculate. The defaults are a worked example.

Formula

NPV = Σ CF_t/(1 + i)^t · Σ CF_t/(1 + IRR)^t = 0 · EAV = NPV·i(1 + i)ⁿ/[(1 + i)ⁿ − 1]

Formulas are evaluated in SI units; inputs and results are converted.

Amounts are in any single currency. Taxes, depreciation and financing are not included.

Show the math

Worked solution

Press Calculate to see every step with your values substituted.

Assumptions

  • End-of-year cash flows; the initial investment occurs at year 0.
  • Constant discount rate; no taxes, depreciation, inflation adjustment or financing costs.

References

  • W. G. Sullivan, E. M. Wicks, C. P. Koelling, Engineering Economy
  • ASTM E917: Measuring life-cycle costs of buildings and building systems

Results are for preliminary design and education. Verify against the governing code and have critical work checked by a licensed professional engineer.