Construction Cost & Fees Estimator

Preliminary project budget from floor area and unit cost, with escalation, contingency, design fees and soft costs.

How it works — Construction Cost & Fees Estimator

GFA €/m² %

Inputs

GFA
Gross floor area (ft²)
€/m²
Building cost per area (/ft²)
%
Contingency (%)

Formula

  • C = GFA × rate × (1 + e)^t × (1 + c)

Results

Σ
Total project cost
Total cost per area

Architect and engineers, as a share of construction

Permits, insurance, testing, project management

Reset

Results

Enter your values and press Calculate. The defaults are a worked example.

Formula

C = GFA × unit cost × (1 + e)^t × (1 + contingency) × (1 + fees + soft)

Formulas are evaluated in SI units; inputs and results are converted.

Amounts are in any single currency. Land, financing and furniture are not included.

Show the math

Worked solution

Press Calculate to see every step with your values substituted.

Assumptions

  • Single blended unit cost; escalation compounds annually to mid-construction.

References

  • RICS New Rules of Measurement (NRM 1)
  • RSMeans / local cost guides for unit rates

Results are for preliminary design and education. Verify against the governing code and have critical work checked by a licensed professional engineer.

Sign in

or with email

Forgot password?