Construction Cost & Fees Estimator

Preliminary project budget from floor area and unit cost, with escalation, contingency, design fees and soft costs.

How it works — Construction Cost & Fees Estimator

GFA €/m² %

Inputs

GFA
Gross floor area (m²)
€/m²
Building cost per area (/m²)
%
Contingency (%)

Formula

  • C = GFA × rate × (1 + e)^t × (1 + c)

Results

Σ
Total project cost
Total cost per area

Architect and engineers, as a share of construction

Permits, insurance, testing, project management

Reset

Results

Enter your values and press Calculate. The defaults are a worked example.

Formula

C = GFA × unit cost × (1 + e)^t × (1 + contingency) × (1 + fees + soft)

Amounts are in any single currency. Land, financing and furniture are not included.

Show the math

Worked solution

Press Calculate to see every step with your values substituted.

Assumptions

  • Single blended unit cost; escalation compounds annually to mid-construction.

References

  • RICS New Rules of Measurement (NRM 1)
  • RSMeans / local cost guides for unit rates

Results are for preliminary design and education. Verify against the governing code and have critical work checked by a licensed professional engineer.