Level 1 — Basic calculation

Battery Runtime

How long a battery bank can power a load, allowing for depth of discharge and inverter efficiency.

How it works — Battery Runtime

C · V DoD η P t

Inputs

C
Capacity (Ah)
V
Nominal voltage (V)
P
Load (W)
η
Inverter efficiency (%)
DoD
Usable depth of discharge (%)

Formula

  • t = (Ah × V × DoD × η) / P

Results

t
Estimated runtime
Euse
Usable energy
I
Battery current

LiFePO₄ ≈ 80–90 %, lead-acid ≈ 50 %

Reset

Results

Enter your values and press Calculate. The defaults are a worked example.

Formula

t = (Ah × V × DoD × η) / P

Formulas are evaluated in SI units; inputs and results are converted.

Show the math

Worked solution

Press Calculate to see every step with your values substituted.

Calculation level & design standard

Level 1 — Basic calculation

A direct engineering equation.

Preliminary engineering calculation — no jurisdiction-specific code compliance claimed. Verify the applicable requirements with a qualified professional.

Assumptions

  • Constant load; capacity at the rated discharge rate (Peukert effect and temperature ignored).

References

  • IEEE Std 1561: Guide for optimizing the performance and life of lead-acid batteries in remote hybrid power systems

Results are for preliminary design and education. Verify against the governing code and have critical work checked by a licensed professional engineer.

Sign in

or with email

Forgot password?